W Communications: 8 Pages Rebuilt for a Four-Decade Consultancy
W Communications: 8 Pages Rebuilt for a Four-Decade Consultancy

Services:
Web Design & Development
Industry:
Professional services (strategic communications)
Timeline
May 2025 to June 2026
Snapshot
8 — pages rebuilt and live
2 — phase delivery, launch surface first
40+ yrs — of firm history repositioned
The challenge
A four-decade strategic-communications consultancy founded by Wanda Herndon, former Starbucks global communications leader, needed a firm-first repositioning ahead of a June book launch — and a site a non-technical client team could edit afterwards.
What I did
Rebuild all eight pages on WordPress in two phases, so the time-sensitive launch surface shipped first and the full site followed without holding up the book.
The work
A redesigned Meet Wanda page, client-logo marquees, book pages, an endorsements slider, navigation and copy, on a custom theme with Figma hero sections and a responsive mobile-first design system. The London event landing page shipped first, the full 8-page rebuild second.
Stack: WordPress, custom theme, Figma, responsive mobile-first design system





Scope: 8 pages rebuilt and live at wcommgroup.com
Sequencing: London event page shipped ahead of the full rebuild
Positioning: repositioned from founder-first to firm-first ahead of the book launch
When a date is fixed, split the delivery. Shipping the launch surface first buys the rest of the build its time.
Industry context
Agencies quote 6 to 8 weeks for a 5 to 10 page build, and 4 to 6 months for a full B2B redesign programme (Webstacks, 2026; Blend B2B, 2025). HubSpot advises beginning redesign planning 90 to 120 days before launch, based on 6,000+ customers (2024).
Other Projects
Want results like these for your brand?
Book a free call and we will map out what is possible for your project.
Book a Call
Demand Designer®
Conversion-focused web design, ad creative, and video editing for B2B brands.
© Demand Designer 2026. All rights reserved.